Kicking Horse Canyon
Phase 4

Kicking Horse Canyon Phase 4 is the last phase of Highway 1 widening just outside of Golden, BC. The project included 4 bridges and 7 viaducts, including the longest MSE wall in 5 kilometres of upgrade. All bridges and viaducts were built on piles drilled into the bedrock. The existing 6KM, 2-lane stretch of winding Highway 1 was transformed into a smooth 4-lane straight highway. The total budget for the project was $700 million. NHKS provided Quality Management Services on behalf of the Province.

 

Main Duties:

​

  • Review all QC test records, checklists, material inspection reports, material receiving reports, work method statements and Hanover/Turnover. documentation for each element.

  • Conduct daily site surveillance.

  • Assist the client with monthly progress draw validation

  • Review project schedule and provide input

  • Review of non-conformance and approval of disposition, root cause and preventative actions.

  • Draft province generated non-conformance related to contractor’s processes and systems.

  • Inspect and close out deficiencies at time of substantial completion.

  • Assist the Project Quality Advisor with audits

​

TI Corp acquired NHKS to close out the project and be present to represent the owner until completion.